What Is a WPI-8? How to Get Your Texas Windstorm Certificate

tdi windstorm inspection

A WPI-8 is the Certificate of Compliance the Texas Department of Insurance (TDI) issues at the end of a TDI windstorm inspection. It shows that a coastal building, or work on it like a new roof or addition, meets the windstorm building code. TWIA (the Texas Windstorm Insurance Association) generally requires it for wind and hail coverage, although some residential properties qualify for exceptions. Most builders and owners just call the whole process a “TDI inspection.” The WPI-8 is the paper you get when it’s done.

This guide explains the WPI-8 certificate, the forms filed along the way, the two routes to a certificate, how to find an existing certificate, and what changed on April 1, 2026.

Where does WPI-8 certification apply?

TDI’s windstorm program applies in its “designated catastrophe areas.” Those are the 14 first-tier coastal counties (Aransas, Brazoria, Calhoun, Cameron, Chambers, Galveston, Jefferson, Kenedy, Kleberg, Matagorda, Nueces, Refugio, San Patricio and Willacy), plus part of Harris County. In Harris County, the property has to be east of Highway 146 and inside the city limits of the cities on TDI’s map. Most of the City of Houston is outside the program. Bay-area communities may be inside it, so check TDI’s catastrophe-area map for your exact address.

Inside those areas, TWIA lists new buildings, additions, roof replacements and other covered improvements as common work needing certification. For the broader explanation of covered projects, inspection stages and costs, see our windstorm inspection requirements and pricing guide.

WPI-8 certificate forms at a glance

Form What it is Who files or issues it When
WPI-1 Application for Certificate of Compliance Owner, builder or engineer. An appointed engineer usually enters it in TDI’s Windstorm system Before construction begins (state law)
WPI-2 (now WPI-2-BC-8) Inspection Verification The TDI-appointed engineer who inspected the work After the final inspection
WPI-8 Certificate of Compliance for new and ongoing work Issued by TDI After TDI approves the WPI-2
WPI-2E Application for completed improvements A Texas-licensed professional engineer, with a sealed report or design After the work is finished
WPI-8-E Certificate of Compliance for completed work Issued by TDI After TDI approves the WPI-2E
WPI-8-C Older completed-work certificate Issued by TWIA Applications from Jan. 1, 2017 to May 31, 2020 only. No longer issued

Current form versions are available in TDI’s windstorm forms directory.

Step one toward your WPI-8: the WPI-1 application

Every TDI windstorm inspection on ongoing work starts with a WPI-1. State law requires you to apply before construction begins. The form records the address, the owner, the builder, the engineer and their Texas registration number, the start date, the building type, and the work type. Work types include an entire building, a full or partial re-roof, re-decking, an alteration, a repair, an addition, foundation-only or mechanical-only work, or a retrofit of all exterior openings for windborne-debris protection.

The WPI-1 is not a building permit. Cities and counties set their own permit rules, so you may need both. If it’s entered online in TDI’s Windstorm system, no paper copy is needed.

WPI-2: the verification that leads to your WPI-8

The inspector visits while the wind-resisting details are still visible.

Once everything passes, the appointed engineer certifies the work on a WPI-2 Inspection Verification. Its suffix shows which code applies, based on when construction started:

  • WPI-2-BC-8: work begun on or after April 1, 2026 (2024 IRC/IBC)
  • WPI-2-BC-7: Sept. 1, 2020 to March 31, 2026 (2018 IRC/IBC)
  • WPI-2-BC-6 / BC-5: older projects under earlier codes

A new building needs only one “new” application, not one for each stage. On an existing building, up to three inspection types, such as a re-roof plus an addition, can share one application.

The 2026 code change

TDI adopted the 2024 International Residential Code and 2024 International Building Code for its catastrophe areas. Work begun on or after April 1, 2026 must be certified to the 2024 editions. Earlier starts are certified to the code in effect at the time. The covered map didn’t change.

Getting the WPI-8: your TDI windstorm certificate

When TDI approves the inspection verification, it issues the WPI-8. TDI says it usually processes forms within about 48 hours, though disasters can slow that down.

A WPI-8 covers the specific work that was inspected, and any new covered work, like a replacement roof or new windows, needs its own TDI inspection and certificate. That’s why one house can have several. TDI even notes that an A/C unit installed after move-in can get a separate WPI-8 later.

How to find an existing WPI-8 certificate

Anyone can look up a certificate by address or application number in TDI’s online Windstorm system, and TWIA and insurers check there too. Choose “Find a Certificate,” search for the property or application, and open the matching record to view and print the certificate. Check that it covers the improvement you need documented.

For a WPI-8-C from the 2017–2020 period, use TWIA’s certificate lookup. Those TWIA-issued records are not in TDI’s database.

Work already finished? The WPI-8-E route

Sometimes a roof goes on before anyone files a WPI-1, or a past owner added a room without an inspection. That’s a completed improvement: the title has passed from builder to first owner, or the work is substantially complete. It may still be certified if compliance can be verified:

  1. A Texas-licensed professional engineer evaluates the work. They don’t have to be TDI-appointed for this route.
  2. The engineer prepares a sealed post-construction report with supporting evidence, or a sealed design they confirm the work matches.
  3. A signed WPI-2E and the sealed documents go to TDI.
  4. If the documentation is approved, TDI issues a WPI-8-E, which serves the same purpose for TWIA.

The catch is that the evidence is now hidden. The engineer may need to remove some roofing, pull window or door trim, or open small sections of wall. TDI says inspecting finished work is usually more invasive and may cost more. Photos, permits, plans and product approvals can reduce how much has to be opened.

If your file has a WPI-8-C, that’s TWIA’s old completed-work certificate from 2017 to 2020. It’s legitimate, but it’s found in TWIA’s lookup tool, not TDI’s. Since June 1, 2020, TDI has issued all certificates.

WPI-8 or WPI-8-E: which certificate route fits?

Path A: new construction or work not yet started (WPI-8)

  1. Confirm the address is in a designated catastrophe area.
  2. Hire your inspector before work starts: an appointed engineer, or a TDI staff inspector for eligible non-structural work.
  3. File the WPI-1.
  4. Build to the 2024 IRC/IBC (for starts on or after April 1, 2026), using TDI-evaluated products where required.
  5. Call for each TDI inspection while the work is exposed, and fix anything that fails.
  6. The engineer files the WPI-2-BC-8.
  7. TDI issues the WPI-8. Send it to your agent and keep a copy.

Existing structures follow this same path when the work hasn’t started yet. That covers re-roofs, re-decking, additions, structural repairs and window or door retrofits. On the WPI-1, list the work type instead of “entire building.”

Path B: completed work never inspected (WPI-8-E)

Search for an existing certificate first. If none covers the work, gather dates, permits, plans, invoices, product labels and photos for the engineer’s evaluation. Use the WPI-2E document checklist above; TDI can issue a WPI-8-E after the required evaluation, corrections and documentation are accepted.

This covers new homes finished without a TDI inspection, as well as roofs, additions and window replacements on older homes.

WPI-8 certificate FAQs

Is a WPI-8 the same as a TDI windstorm certificate?

Yes. The WPI-8 is the Certificate of Compliance TDI issues after a TDI windstorm inspection of ongoing work. A WPI-8-E is the version for work certified after completion.

How is a WPI-1 different from a WPI-8?

The WPI-1 is the application that opens your TDI inspection file before construction starts. The WPI-8 is the certificate at the end. You need the first to get the second.

Does a WPI-8 cover later improvements?

A WPI-8 documents the specific work that was certified. New covered work, like a replacement roof, needs its own TDI inspection and certificate.

Can I get a TDI windstorm certificate after the work is done?

Yes, through the WPI-2E process, which ends in a WPI-8-E. Expect a more involved inspection, because hidden details have to be verified.

Where can I find an existing WPI-8?

Search TDI’s Windstorm system by address or application number. For a WPI-8-C issued by TWIA during 2017–2020, use TWIA’s certificate lookup.

Which code applies to my project?

It depends on the start date. Work begun on or after April 1, 2026 must be certified to the 2024 IRC or IBC on the WPI-2-BC-8.

Get help with your WPI-8 certificate

The easiest WPI-8 is the one planned before the first shingle comes off or the first form board goes down. 1ST Choice Consulting provides TDI windstorm inspection services and helps Houston-area owners, builders and roofers get their WPI-8 certificate. If the work is already finished, 1ST Choice Consulting offers post-construction evaluations for WPI-8-E certification, subject to verified compliance. See our windstorm inspection pricing and scheduling guide, request a quote, or call (281) 968-4460. You can also visit us at 10232 Longmont Drive, Houston, TX 77042.

General information, not legal or insurance advice. Rules can change, so confirm current requirements with TDI (800-248-6032, tdi.texas.gov/wind) before starting work.